Document the electrical interface before comparing a replacement PSU.

1. Photograph every interface
Capture the input, output and control connectors clearly. Include the label and cable arrangement so the part can be identified in context.
2. Check the pinout
A matching connector shape does not prove an equivalent electrical interface. Compare the model-specific pinout and the host equipment documentation.
3. Include the harness
Confirm cable lengths, connector quantity and the supplied harness configuration. The wiring should be identified as part of the agreed supply.
4. Resolve uncertainty before ordering
Ask for the relevant interface drawing and identify any remaining equipment-level checks. Do not connect an unverified candidate based only on appearance.
What to include when you contact us
- Complete PSU and equipment model information.
- Quantity, destination and required delivery window.
- Available labels, drawings and connector photographs.
- The exact configuration and documents you need.
XinTongTai uses 20 years of server power supply experience to support sourcing and selection discussions. Exact stock, configuration, documentation and order terms are confirmed individually.
Need help with a specific model?
Send the full part number, quantity and your equipment requirements.
Discuss your requirement ↗



